Автор Тема: Rio - Сервизни бюлетини  (Прочетена 109576 пъти)

CoolMaN®

  • Наблюдава денонощно
  • Spammer
  • *****
  • Публикации: 933
Rio - Сервизни бюлетини
« -: Юли 13, 2012, 04:09:05 pm »
Сервизни бюлетини KIA Rio (UB) - 2012
(списъкът ще се актуализира когато се появи нов бюлетин в системата на KIA)


Само за България:
7/6/2012, General, KGE12-92-P210 - Introduction of new service procedure for Mobis Audio
7/6/2012, General, KGE12-10-P140 - 41th LABOR TIME STANDARDS UPDATE
7/6/2012, Field Fix, KFE12-14-E180 - ECM UPGRADE - UB 1.2 AUTO CRUISE CONTROL LOGIC IMPROVEMENT
7/6/2012, General, KGE12-12-P150 - U-ENGINE WATER PUMP AND MOUNTING BOLT CHANGE
7/6/2012, General, KGE12-10-P120 - 40th LABOR TIME STANDARDS UPDATE
7/6/2012, General, KGE12-52-P031 - (REVISED) 4-SPEED A/T (A4CF0/1/2) VALVE BODY CHANGE
7/6/2012, General, KGE12-52-P021 - (REVISED) 6-SPEED A/T VALVE BODY ACCUMULATOR PISTON AND COIL SPRING CHANGE
7/6/2012, General, KGE12-52-P030 - KGE12-52-P030 REVISED SEE KGE12-52-P031
7/6/2012, General, KGE12-52-P020 - KGE12-52-P020 REVISED SEE KGE12-52-P021
7/6/2012, Field Fix, KFE12-51-P030 - CLUTCH DISC AND COVER ASSEMBLY REPLACEMENT
7/6/2012, General, KGE11-13-P011 - (REVISED) A/U DIESEL ENGINE EGR VALVE BODY SERVICE KIT
7/6/2012, General, KGE12-10-P090 - 39th LABOR TIME STANDARDS UPDATE

5/23/2012, General, KGE12-92-P140 - NOTICE OF AVN REGULAR SOFTWARE UPGRADE
5/3/2012, General, KGE12-52-P031 - (REVISED) 4-SPEED A/T (A4CF0/1/2) VALVE BODY CHANGE
5/3/2012, General, KGE12-52-P021 - (REVISED) 6-SPEED A/T VALVE BODY ACCUMULATOR PISTON AND COIL SPRING CHANGE

4/11/2012, General, KGE12-10-P070 - 38th LABOR TIME STANDARDS UPDATE
4/11/2012, General, KGE12-61-P030 - ASSEMBLY & DISASSEMBLY PROCEDURES OF EPS GEAR BOX ASSEMBLY

3/7/2012, General, KGE11-10-P420 - 35th LABOR TIME STANDARDS UPDATE
3/7/2012, General, KGE12-91-P030 - NOTIFICATION ON NEW PAINT COLOR CODES FOR 2012MY RIO (UB/QBr)
3/7/2012, General, KGE12-10-P020 - 36th LABOR TIME STANDARDS UPDATE
3/7/2012, General, KGE12-12-P070 - SERVICE PRECAUTIONS - ENGINE OIL FILTER REPLACEMENT ON U- ENGINE
3/7/2012, Service Action, KCE11-11-P241 - (REVISED) BATTERY CABLE TERMINAL REPLACEMENT
3/7/2012, General, KGE12-10-P050 - 37th LABOR TIME STANDARDS UPDATE
3/7/2012, Field Fix, KFE11-92-P720 - HEAD LAMP MOISTURE INSPECTION AND DEFOGGING PROCEDURE

2/23/2012, Service Action, KCE11-11-P240 - KCE11-11-P240 REVISED SEE KCE11-11-P241: BATTERY CABLE TERMINAL REPLACEMENT
2/23/2012, Service Action, KCE11-61-P080 - STEERING WHEEL SPRING WASHER REPLACEMENT
2/23/2012, Service Action, KCE11-11-P241 - (REVISED) BATTERY CABLE TERMINAL  REPLACEMENT

11/28/2011, General, KGE11-92-P700 - SERVICE REMINDER FOR POWER WINDOW REGULATOR MOTOR INITIALIZATION
« Последна редакция: Септември 30, 2012, 12:32:37 pm от coolman_kk »

CoolMaN®

  • Наблюдава денонощно
  • Spammer
  • *****
  • Публикации: 933
« Последна редакция: Ноември 12, 2012, 09:06:10 pm от CoolMaN® »